Ordering 3D Printed Parts for a Business: Quotes, Invoices, W-9s, and Purchase Orders
What a purchasing team needs to buy 3D printed parts: a quote that matches the PO, vendor documents, tax status, invoices, revisions and approval steps.

The Short Answer
A business buys 3D printed parts the way it buys other custom parts: a quote for the exact files, a vendor setup, a purchase order against that quote, and an invoice paid on agreed terms. We accept purchase orders and issue invoices. Net terms (Net 30 or Net 60) are available on approval and are never automatic, and the W-9, certificate of insurance and capability statement are sent after you complete the vendor form. Our procurement page collects the documents and forms in one place; this guide explains how the pieces fit together so a PO goes through the first time.
Who Does What
In many organizations a purchase passes through several people. Each step needs something specific from the one before it, and a missing item sends the request back a step.
| Step | Usually done by | What they need |
|---|---|---|
| 1. Request | Engineer or requester | Final files, part list, quantities, need-by date |
| 2. Quote | Requester | A quote for those exact files, materials and quantities |
| 3. Approval | Budget holder | The quote document and the reason for the purchase |
| 4. Vendor setup | Purchasing | W-9, COI, capability statement, supplier codes |
| 5. Purchase order | Purchasing | Quote reference, ship-to, bill-to, terms, tax status |
| 6. Invoice and payment | Accounts payable | An invoice that matches the PO |
What Belongs in the Request
Engineering and purchasing should agree on these before anyone asks for a quote. Most of them change the price or the part.
- A part list: one file per part, with the file name and revision.
- Process for each part, FDM or SLA. One order can mix both, and each part is priced by its own process and material (see mixing FDM and SLA in one order).
- Material and color for each part, from the materials catalog.
- Quantity for each part. Quantity pricing tiers are applied automatically on the quote.
- Finishing: sanding, vapor smoothing (ABS and ASA), painting, threaded insert installation, dyeing or assembly on FDM parts. Post-processing is quoted on request.
- Units for STL and OBJ files, which carry none and are read as millimeters (see STL units).
- The ship-to address, a receiving contact and, if different, the bill-to contact.
- Tax status: taxable, tax-exempt or resale.
- The vendor documents your organization requires before it can issue a PO.
The Quote Is What Everything Matches
The instant quote prices each part from the uploaded file with its own process, material, color and quantity, and shows the measured part size in the Model size panel under the 3D viewer. Check that size before approval: a file drawn in inches and exported as STL reads 25.4 times too small, and the quote page lets you declare the file's authoring unit (mm, cm or in) to rescale and reprice it. The uploaded file is never altered. The quote page can be downloaded as a PDF for whoever approves the purchase. Put the quote reference on the PO, so purchasing, engineering and our team are looking at the same parts and the same price.
When the Quote Has to Change
A changed file, material, color or quantity is a different order and needs a revised quote. These are the usual triggers between approval and PO:
- Engineering releases a new file revision after the quote was approved.
- The material changes, for example to a more weather-resistant one for an outdoor part (see PETG vs ASA for outdoor parts).
- The quantity changes. Because tiers apply automatically, the per-part price changes with it.
- Finishing is added or removed.
- An STL's units are corrected, which rescales the part and reprices it.
After the PO Is Issued
If something changes after the PO is out, issue a PO change on your side that references the revised quote, rather than letting the invoice and the PO disagree. If your approval cycle is long, confirm the quote is still current before the PO goes out.
Vendor Setup: W-9, COI and Capability Statement
Request vendor documents through the vendor form; the W-9, certificate of insurance, capability statement and vendor packet are sent after you submit it.
| Document | What it is for | Where it comes from |
|---|---|---|
| Form W-9 | Our legal name and taxpayer ID for your records | Vendor form |
| Certificate of insurance | Evidence of our insurance coverage | Vendor form |
| Capability statement | An overview of our services | Vendor form |
| Vendor packet | The documents above, together | Vendor form |
| NAICS and NIGP codes | Classifying the supplier in your system | NAICS codes page |
What Each Document Does, and Does Not Do
- Form W-9: per the IRS, a requester uses it to get a payee's correct name and taxpayer identification number for information returns. The form itself says to give it to the requester and not to send it to the IRS, so it goes in your vendor file.
- Certificate of insurance: the Connecticut Insurance Department describes a certificate as evidence of insurance and a snapshot of coverage on the day it is issued. It cannot amend the policy and does not by itself make the holder an additional insured. If your vendor policy requires specific coverage or wording, put the requirement in your vendor request so the team can confirm what can be provided.
- Capability statement and vendor packet: an overview of our services for your supplier record, and the documents above combined for a vendor management system.
- NAICS and NIGP codes: industry and commodity codes that purchasing systems use to classify suppliers. In federal acquisitions, FAR 19.102 has the contracting officer assign one NAICS code to each solicitation. Ours are listed on the NAICS codes page.
Tax-Exempt and Resale Orders
Tax-exempt and resale certificates are kept on file, so you do not need to attach one to every order. Set it up once with a business account, and mark each PO as tax-exempt where it applies. Send the current certificate when yours renews: some states issue certificates for a single year, and Florida, for example, issues a new Annual Resale Certificate each year to businesses registered to collect sales tax. Florida's Department of Revenue also requires a seller to document each tax-exempt sale for resale, which is why a seller asks for the certificate before it invoices a sale without tax.
Invoices, Terms and Payment
Submit POs and invoice requests through the PO and invoice form, referencing the quote. We issue invoices for PO orders. Net terms (Net 30 or Net 60) are available on approval for business accounts, never automatically, so apply before the first order that needs them rather than writing terms onto a PO. A team that does not need a PO can pay online at checkout; the order, the files and the parts are the same either way.
- Tell us where your accounts payable team needs the PO number to appear and who receives invoices.
- Say whether the PO covers shipping, so the invoice and the PO agree.
- Name the person who approves the invoice, if it is not the requester.
Shipping and Receiving
Parts ship from Fort Lauderdale, Florida. Put the ship-to address and a contact who can receive the delivery on the PO, and a separate bill-to contact if invoices go elsewhere. See the shipping policy for shipping details. For a batch that will repeat, ordering 25 to 1,000 printed parts covers revision control and inspection, which keep a reorder matching the first PO.
Checklist for a PO That Goes Through
- Quote reference that matches the files, revisions, materials, colors and quantities on the PO.
- A revised quote and a PO change for anything that changed after approval.
- W-9, COI and capability statement in your vendor file before the PO is issued.
- Tax status marked, with the current certificate on file.
- Net terms approved in advance, or payment online at checkout.
- Ship-to address, receiving contact, bill-to contact and where the PO number must appear.
- A need-by date, if the parts have one.
Frequently asked questions
Do you accept purchase orders?
Do you offer Net 30 terms?
How do we get your W-9 and certificate of insurance?
Do we need to send our tax-exempt certificate with every order?
What happens if engineering changes the file after the PO?
Sources
- IRS: About Form W-9, Request for Taxpayer Identification Number and Certification
- IRS: Form W-9 (Rev. March 2024)
- IRS: Instructions for the Requester of Form W-9
- Connecticut Insurance Department: Bulletin S-14, Use of Certificates of Insurance
- Florida Department of Revenue: Annual Resale Certificate for Sales Tax
- Acquisition.gov: FAR 19.102, Size standards
Send the PO with the quote reference
Reference your quote, add your billing contact and the terms you have been approved for, and the team routes it. Need vendor documents first? Start with the vendor form.
Submit a purchase order